logo

Online Public Access Catalogue

The People Capability Maturity Model : (Record no. 4888)

000 -LEADER
fixed length control field 04983cam a2200229 a 4500
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
ISBN 0201604450
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title English
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.3
100 1# - MAIN ENTRY--AUTHOR NAME
Author name Curtis, Bill.
245 14 - TITLE STATEMENT
Title The People Capability Maturity Model :
Sub Title guidelines for improving the workforce /
Statement of responsibility, etc Bill Curtis, William E. Hefley, Sally A. Miller.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication Boston :
Name of publisher Addison-Wesley,
Year of publication c2002.
300 ## - PHYSICAL DESCRIPTION
Number of Pages xx, 587 p. :
Other physical details ill. ;
Dimensions 25 cm.
440 #0 - SERIES STATEMENT/ADDED ENTRY--TITLE
Title SEI series.
440 #0 - SERIES STATEMENT/ADDED ENTRY--TITLE
Title SEI series in software engineering
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references (p. 495-501) and index.
505 8# - FORMATTED CONTENTS NOTE
Formatted contents note Machine generated contents note: PART ONE - THE PEOPLE CAPABILITY MATURITY MODEL: -- BACKGROUND, CONCEPTS, STRUCTURE, AND USAGE -- 1 THE PROCESS MATURITY FRAMEWORK -- 1.1 What Is the People CMM? -- 1.2 Why Do We Need a People CMM? -- 1.3 What Is the Process Maturity Framework? -- 1.4 How Did the Process Maturity Framework Spread? -- 1.5 Why Did the People CMM Emerge in the Software Industry? -- 2 OVERVIEW OF THE PEOPLE CMM -- 2.1 Organizational Maturity -- 2.2 Maturity Levels in the People CMM -- 2.3 Behavioral Characteristics of Maturity Levels -- 2.3.1 The Initial Level: Maturity Level 1 -- 2.3.2 The Managed Level: Maturity Level 2 -- 2.3.3 The Defined Level: Maturity Level 3 -- 2.3.4 The Predictable Level: Maturity Level 4 -- 2.3.5 The Optimizing Level: Maturity Level 5 -- 3 PEOPLE CMM PROCESS AREAS -- 3.1 Process Area -- 3.2 The Process Areas of the People CMM -- 3.2.1 The Initial Level: Maturity Level 1 -- 3.2.2 The Managed Level: Maturity Level 2 -- 3.2.3 The Defined Level: Maturity Level 3 -- 3.2.4 The Predictable Level: Maturity Level 4 -- 3.2.5 The Optimizing Level: Maturity Level 5 -- 3.3 Process Area Threads in the People CMM -- 3.3.1 Developing Individual Capability -- 3.3.2 Building Workgroups and Culture -- 3.3.3 Motivating and Managing Performance -- 3.3.4 Shaping the Workforce -- 4 THE ARCHITECTURE OF THE PEOPLE CMM -- 4.1 Structural Components of the People CMM -- 4.2 Maturity Levels -- 4.3 Process Areas -- 4.4 Goals -- 4.5 Practices -- 4.5.1 Implementation Practices -- 4.5.2 Institutionalization Practices -- 4.5.3 Practice Statements -- 4.6 Required, Expected, and Informative Components -- 5 INTERPRETING THE PEOPLE CMM -- 5.1 Applying Professional Judgment -- 5.1.1 Organizational Factors -- 5.1.2 Goodness of Workforce Practices -- 5.2 Interpreting the Practices -- 5.2.1 Commitment to Perform -- 5.2.2 Ability to Perform -- 5.2.3 Practices Performed -- 5.2.4 Measurement and Analysis -- 5.2.5 Verifying Implementation -- 5.3 Organizational Roles and Structure -- 5.3.1 Organizational Roles -- 5.3.2 Organizational Structure -- 5.4 Institutionalization Issues -- 5.4.1 Maturity Level 2 Procedures versus Maturity -- Level 3 Defined Practices -- 5.4.2 Defined, But Not Quantified or Optimized -- 5.5 Maturity Level Concerns -- 5.5.1 Maturity Level 3 Is Enough! -- 5.5.2 Level Fever -- 5.5.3 Skipping Maturity Levels -- 5.5.4 Ignoring Process Areas -- 5.5.5 Implementing Practices Out of Maturity -- Level Sequence -- 6 USING THE PEOPLE CMM -- 6.1 Uses of the People CMM -- 6.2 The IDEAL Life Cycle Model for Improvement -- 6.3 People CMM as a Guide for Improvement -- 6.4 People CMM as a Basis for Assessments -- 6.4.1 People CMM-Based Assessment Method -- 6.4.2 Joint Assessments -- 6.4.3 Questionnaire-Based Assessments -- 6.4.4 Gap Analyses -- 6.5 Implementing a People CMM-Based Improvement Program -- 6.5.1 Planning and Executing an Improvement Project -- 6.5.2 Implementing Maturity-Based Improvement Programs -- 7 EXPERIENCE WITH THE PEOPLE CMM -- 7.1 Adoption of the People CMM -- 7.2 Benefits -- 7.3 Case Studies -- 7.3.1 Boeing Business Resources Support -- 7.3.2 Novo Nordisk IT A/S -- 7.3.3 Lockheed Martin Mission Systems -- 7.3.4 Tata Consulting Services -- 7.4 Conclusion -- PART TWO - PROCESS AREAS OF THE PEOPLE CAPABILITY -- MATURITY MODEL -- THE MANAGED LEVEL: MATURITY LEVEL 2 -- Staffing -- Communication and Coordination -- Work Environment -- Performance Management -- Training and Development -- Compensation -- THE DEFINED LEVEL: MATURITY LEVEL 3 -- Competency Analysis -- Workforce Planning -- Competency Development -- Career Development -- Competency-Based Practices -- Workgroup Development -- Participatory Culture -- THE PREDICTABLE LEVEL: MATURITY LEVEL 4 -- Competency Integration -- Empowered Workgroups -- Competency-Based Assets -- Quantitative Performance Management -- Organizational Capability Management -- Mentoring -- THE OPTIMIZING LEVEL: MATURITY LEVEL 5 -- Continuous Capability Improvement -- Organizational Performance Alignment -- Continuous Workforce Innovation -- PART THREE - APPENDICES -- A REFERENCES -- B ACRONYMS -- C GLOSSARY OF TERMS -- D PRACTICE-TO-GOAL MAPPINGS FOR PEOPLE CMM -- PROCESS AREAS.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Subject Personnel management
General subdivision Computer programs.
700 1# - ADDED ENTRY--PERSONAL NAME
Author 2/ Editor Hefley, William E.
700 1# - ADDED ENTRY--PERSONAL NAME
Author 2/ Editor Miller, Sally A.
856 41 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier http://www.loc.gov/catdir/toc/fy031/2001134026.html
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Books
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Source of acquisition Cost, normal purchase price Bill Date Full call number Accession Number Price effective from Koha item type
          Institute of Public Enterprise, Library Institute of Public Enterprise, Library S Campus 10/24/2006 M/s Higginbothoms 325.00 2004-01-17 658.3 31395 06/08/2020 Books